Job List

The projects left to complete to make Pleinair ready.

Completed if listed in green. work in progress in orange. Updated 1st July 2022

  • full engine strip down and service.
  • change internal lights to LED.
  • full rewire.
  • reconstruct chart table.
  • install new starter battery in new location.
  • rebuild and replace thru-hull at transducer.
  • replace hull through hulls.
  • service all winches.
  • service and replace where necessary, all seacocks.
  • replace majority of running rigging.
  • rewire mast.
  • change radar for digital one.
  • change faucets at sink in galley.
  • change faucet in heads.
  • add pressurised water system.
  • add hot water.
  • add windlass.
  • change anchor.
  • build anchor bridle.
  • change all external lights to LED.
  • obtain new, larger water tank.
  • introduce a holding tank.
  • replace heads.
  • alter and rebuild solar arch.
  • change battery management system.
  • re-epoxy hull.
  • strip both keels, treat and repaint, antifoul.
  • clean, strip and varnish galley area woodwork.
  • lift cooker to clear hull when swinging on gimbals.
  • Raise base of Anchor locker to stop water build up.
  • Build Battery platform for Windlass Power.
  • Obtain and/or fabricate new pushpit, incorporating the solar arch.
  • Replace all fenders.
  • Create alternative battery box. (prob saloon starboard)
  • Refurbish and recover engine box and companionway steps.
  • Replace washboards.
  • replace deck hardware on cabin top.
  • reroute cables
  • Layin pipework for future use
  • Template tanks
  • Create loo roll holder in heads sink unit. (under sink box)
  • Paint topsides of Hull. Prep work done!
  • Convert storage shelves in cabin to full cupboards with doors.
  • Seal windows.
  • Completely replace all curtains, cushions and upholstery.
  • Remove all teak slatting in cockpit and replace with alternative.